- Home
- Government
- Community Services
- Park Master Plans
- Collier Park
- Final Environmental Impact Report
Table of Contents
Part 1 Introduction
Part 2 Mitigation Monitoring & Reporting Program
Part 3 Response to Comments
Chapter 1 Summary (revised)
Chapter 2 Introduction (revised)
Chapter 3 Environmental Setting
Chapter 4 Project Description (revised)
Chapter 5 Existing Conditions, Impacts and Mitigation
5.1 Aesthetics
5.2 Air Quality
5.3 Biological Resources
5.4 Cultural Resources (revised)
5.5 Geology and Soils
5.6 Greenhouse Gas Emissions
5.7 Hazards and Hazardous Materials
5.8Hydrology and Water Quality
5.9 Noise (revised)
5.10 Transportation and Traffic
Chapter 6 Cumulative Impacts (revised)
Chapter 7 Other CEQA Considerations
Chapter 8 Alternatives (revised)
Chapter 9 References (revised)
Chapter 10 EIR Preparers
Appendix A Notice of Preparation and Comments on the NOP
Appendix B Air Quality Analysis
Appendix C Biological Resources Letter Report
Appendix D Cultural Resources Survey
Appendix E Historic Resources Evaluation Report (revised)
Appendix F Preliminary Geotechnical Investigation
Appendix G Greenhouse Gas Emissions Analysis
Appendix H Noise Technical Report (revised)
Appendix I Traffic Impact Analysis